Edelbrock 2010 Manual de instalación Pagina 30

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 41
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 29
©2014 Edelbrock LLC
Part #1574, 1575, 1576
Brochure #63-1574
Rev. 9/24/14 - QT
Edelbrock GM LS3 Supercharger System for
2010 and later Grand Sport Corvettes
Installation Instructions
Page 22
140. Apply blue loctite to the threads of a 20mm bolt
supplied in Bag #1, then use a 12mm socket and the
supplied washer to mount the pulley on the new lower idler
bracket and torque it to 18 ft-lbs.
141. Use a 10mm socket to remove the three bolts on the
passenger side of the water pump.
142. Use a 6mm Allen tool and the three 90mm bolts
supplied in Bag #1 to install the lower idler bracket on the
water pump then torque them to 18 ft-lbs.
143. Use a 15mm socket and the two stock bolts to mount
the new tensioner bracket onto the water pump then torque
them to 37 ft-lbs.
144. Use an 8mm allen tool to install the 45mm bolt
supplied in Bag #1 that retains the tensioner bracket to the
cylinder head and torque it to 37 ft-lbs.
145. Apply blue loctite to the threads of a 20mm bolt
supplied in Bag #1, then use a 12mm socket and the
supplied washer to mount the pulley on the tensioner
bracket and torque it to 18 ft-lbs.
146. Use a 15mm socket and the 75mm bolt supplied in
Bag #1 to install supplied tensioner on new bracket and
torque it to 37 ft-lbs.
147. Use a 12mm socket and a 20mm bolt supplied in Bag
#1 to mount the EVAP purge solenoid on the back of the
new tensioner bracket.
Vista de pagina 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 40 41

Comentarios a estos manuales

Sin comentarios